STEP Trutnov ... výroba a dodávky tepelných a energetických zařízení STEP Trutnov

Of interest

UTILIZATION OF THE UNIVERSAL BOILER FOR COMBUSTION OF WHOLE BALES OF HAY

Recently, the attractiveness of energy crops for burning has increased namely in the field of agriculture. This mainly involves burning hay harvested from permanent grass stands, especially meadows and pastures.

whole report...

Universal boiler for burning (not only) whole bales of straw

Biomass-fired boilers with outputs ranging from 100 to 1,000 kW are now mostly designed for either burning straw or waste wood.

whole report...

Biomass boiler room

The construction of the biomass-fired boiler plant with a boiler for burning whole bales of straw and energy crops at Step TRUTNOV a.s. was completed and put ...

whole report...

Florcenter Olomouc

Stages I. and II. of building biomass boiler room in Flor center Olomouc have been completed. The boiler room is exceptional in that it burns whole packs of straw...

whole report...

Vacancies

In connection with production expansion, the company will establish workers to the following positions: welder with basic training in accordance with official standards EN 287-1 111 and EN 287-1 135. Also a project engineer to dealing with orders from abroad - language qualifications needed.

whole report...


Map

Mapa

Investment activities

Řecko - Thessaloniki Greece - Thessaloniki
A transport container hydrothermal boiler room 2 x 2.1MW.


State Health Resort, Jánské Lázně s.p.
Exchanger station reconstruction in the Spa building.

Secondary school and SOŠ Úpice
Reconstruction and exchanger station, realization of warm-water conduits and piping bridges across Úpa river, realization of regulation system and thermal regulation valves.

Fitmin a.s. Helvíkovice Fitmin a.s. Helvíkovice
New biomass steam boiler room of power rating 1 290kW, with steam piping.


Rehamedica Žacléř Rehamedica Žacléř
New hydrothermal gas boiler room of power rating 720kW with hot water piping and interchange station for hot and cold utility water.

HARPEN CZ s.r.o.
Repair and reconstruction of Českoskalická exchanger station.

HARPEN CZ s.r.o.
Reconstruction of steam and hot water conduits from "Karlovo náměstí" exchanger station.

HARPEN CZ s.r.o.
Repair and reconstruction of "Karlovo náměstí" exchanger station .

Wood company PRAŽAN s.r.o.
Modifications and reconstructions of a 2MW hydrothermal biomass boiler.

Czech prison service – Odolov prison
Heating and steam distribution piping realization in Odolov prison. New distribution piping in collectors and in prison premises.

Reconstruction of exchanger station 13 – Jiráskovo nám.,Trutnov
Central heating and hot water reconstruction in exchanger station 13 and in the building's hot and cold utility water interchange stations.

Reconstruction of VSMŠ Na Struze, Trutnov
Reconstruction of central heating and hot utility water in exchanger station and of the building's hot and cold utility water interchange station.

HARPEN CZ s.r.o.
Repair and reconstruction of Orlická exchanger station.

Heating in Tkalcovská street, exchanger station 13, Trutnov
Reconstruction of exchanger station 13 with a pressure-free central heating warm-water distribution.

Heating of Jiráskova náměstí ,Trutnov
and reconstruction of exchanger station 13 with drainless warm-water distribution and in the building's hot and cold utility water interchange stations.

Rokytnice v Orlických horách Rokytnice v Orlických horách
Boiler room burning wooden waste, of power rating 1.0MW, including stage II. hot water network extension and interchange stations.

BS spol.s.r.o. – Nové Město nad Metují
Delivery and installation of 2 exchanger stations, 400kW each, including hot water connections.

Town hall in Svoboda nad Úpou
Horní Maršov municipality heating – hot water network with interchange stations.

Kotelny na biomasu Bouzov municipality
Boiler room burning wooden waste, of power rating 2.7MW, including warm-water distribution piping within the municipality and to the exchanger stations.

Město Trutnov – exchanger station reconstruction - cinema
Complete reconstruction of exchanger station 02, in "Vesmír" cinema in Trutnov.

Věznice Oráčov Oráčov prison
Prison gas installation, accommodation and production zone - building a central boiler room including heating distribution in the prison premises.